If the specified oversized particle maximum percentage is exceeded, other methods of compaction control must be used. Note 1 —One method for the design and control of the compaction of such soils is to use a test fill to determine the required degree of compaction and a method to obtain that compaction. Then use a method specification to control the compaction by specifying the type and size of compaction equipment, the lift thickness, and the number of passes.
The following applies to all specified limits in this standard: For the purposes of determining conformance with these specifications, an observed value or a calculated value shall be rounded off "to the nearest unit'' in the last right-hand place of figures used in expressing the limiting value, in accordance with ASTM E The values stated in SI units are to be regarded as the standard. Scope 2.
Referenced Documents 3. Apparatus Method a 4. Sample 5. Procedure Method B 6. Drawing and Drafting. Telecommunications Standards. AWS D1. Means, Inc. Active Only. View More Browse Publishers. Top Sellers. New Releases. My Account. Corporate Sustainability. Investor Relations. Then you just came to the end of your search as you need not search anymore.
I bring you the latest information on this Collegelearnerssite where you can download aashto green book in PDF without any cost or registration. What are you waiting for? All the public policy books you need, now at your fingertips on Collegelearnerssite!
This edition presents an updated framework for geometric design that is more flexible, multimodal, and performance-based than in the past. The document provides guidance to engineers and designers who strive to make unique design solutions that meet the needs of all highway and street users on a project-by-project basis.
0コメント